Rio Grande Substation Investigation
This project consisted of evaluating three existing lattice structures for new loads due to rearranging transmission lines. These revised lines were due to the construction of a new generator. Our services included providing the as-built survey, analysis of the structure with a 3D model, and providing construction documents with the required modifications to the structure. Based on our recommendations we were able to arrange the conductors in a way that allowed our client to maintain this structure as opposed to replacing it.