300 E. Main, Suite 908, El Paso, TX 79901       |       Phone (915)228-3488      |      Fax (915)228-3499

Copyright © 2015 Stubbs Engineering, Inc. All rights reserved.                                          Stubbs Engineering, Inc., 277 E. Amador Ave Ste 200, Las Cruces, NM 88001       |       Phone (575)993-5228      |      Fax (575)219-6177

Education

Bachelor of Science in Civil Engineering - 2012

New Mexico State University


Professional Licenses

  • Licensed Professional Engineer 
    • New Mexico​
    • Texas 


Professional Affiliations

  • American Society of Civil Engineers - Member (Past Vice President ASCE Southern New Mexico Branch)
  • ​​American Institute of Steel Construction: Professional Member 
  • ​American Concrete Institute - Professional Member
  • Structural Engineering Association of Texas - Professional Member


Projects

Architectural Projects

  • Las Cruces High School, Las Cruces, NM 
  • The Lofts Apartments at Alameda - Las Cruces, NM
  • St. Mark's School - Middle School Campus - El Paso, TX
  • First United Methodist Church Addition - Carlsbad, NM

Construction Engineering

  • St. Francis - TEC Tower Expansion - Tulsa, OK
  • Ft. Bliss Hospital Replacement - El Paso, TX

Electrical Transmission

  • Newman Substation Line and Bus Analysis
  • Dyer Substation Analysis​


As a Structural Engineer and El Paso Branch Manager for Stubbs Engineering, Inc., Justin Atteberry oversees the design and construction for our projects in the El Paso area.  His experience ranges from a wide variety of projects big and small. Justin Atteberry strives towards making the client’s vision come to fruition while maintaining an easy constructability path and staying within economic restrictions. 


Mr. Atteberry graduated from New Mexico State University and soon started work for Stubbs Engineering.  Since then he has been working with the firm on several different projects.  This included a renovation and addition to the one of the local high schools which has a 110ft. by 20ft. wide fully enclosed pedestrian bridge over a five lane road.  He has also designed a 22,000 sq. ft. two story church addition.  ​

Justin Atteberry, PE

Structural engineer - El paso area manager